Protection
- Floors are protected to ensure no drips
- Furniture is moved and covered

Ceilings
- Water stains are sealed (if necessary)
- Missing stipple (large area) is re-stippled with spray (if necessary)
- Flat latex paint is typically used to coat the ceilings
Preparation
- Walls are sanded to remove rough imperfections

First Coat
- A coat is applied of the beautiful color of your choice
Inspection and Filling
- Walls are inspected with trouble light to search out imperfections
- Imperfections are then filled or caulked as necessary
- All filled areas are spot primed to ensure uniform sheen

Second Coat
- Another coat is applied to ensure a full finish and immaculate color
Additional Coats (if necessary)
- Needed to cover bright colors
- Needed when clear base colors are chosen like red, yellow and some deeper greens and blues

Inspection
- The supervisor will inspect the entire job to ensure it is up to Stanmark quality standards
Customer walk around
- The supervisor/manager will do a final walk around with the client to ensure they are satisfied

